Federal Highway Administration
HEC-24 Highway Stormwater Pump Station Design
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Title/edition from FHWA Highway Drainage publications list (HEC-24, February 2001). HY-22 citation appears with OCR artifact. BMPs referenced generically for NPDES compliance but no approved BMP category list. water_quality_volume_method not stated (pump-station hydrology focus).
Document Metadata
“mandatory for interstate highways”
Chapter 5 – Site Planning and Hydrology, 5.3.2 Design Frequency, pages 65-66
No evidence cited
“queue id fhwa-hec-24; Hydraulic Engineering Circular stormwater pump station manual context”
Corpus fhwa-hec-24
No evidence cited
No evidence cited
“The choice of hydrologic methods is either based on agency standard practice or left up to the designer based on local conditions and judgment.”
Chapter 5 – Site Planning and Hydrology, 5.4.1 Hydrologic Methods, page 66
Design Criteria
“The recommended design for a highway stormwater pump station is a return period of 50 years”
Chapter 5 – Site Planning and Hydrology, 5.3.2 Design Frequency, pages 65-66
No evidence cited
“National Resources Conservation Service (NRCS) – formerly Soil Conservation Service) – Tabular Hydrograph Method of Technical Release 55, Urban Hydrology for Small Watersheds (TR55),8”
Chapter 5 – Site Planning and Hydrology, 5.4.1 Hydrologic Methods, page 66
“Methods available in the computer programs HEC-1 and HEC-HMS.”
Chapter 5 – Site Planning and Hydrology, 5.4.1 Hydrologic Methods, page 66
No evidence cited