Urban Drainage and Flood Control District (Denver Metro)
Urban Storm Drainage Criteria Manual Volume 3, Chapter 1: Stormwater Management and Planning
This extraction needs human review.
Source is USDCM Volume 3 Chapter 1 only (planning and regulatory overview). WQCV (0.6 in.) and Four Step Process are explicit; peak flow calculation methods and required software appear in later chapters. Jurisdiction is UDFCD (Denver metro special district); document hosted at mhfd.org.
Document Metadata
“Urban Drainage and Flood Control District”
Page 1-1, Chapter 1
“The Colorado Water Quality Control Act (25-8-101 et seq., CRS 1973, as amended)”
Section 3.2, Page 1-7
“November 2015 Urban Drainage and Flood Control District”
Page 1-1, Chapter 1
No evidence cited
No evidence cited
“UDFCD criteria are based on a Four Step Process focused on reducing runoff volumes, treating the remaining WQCV, stabilizing receiving drainageways and providing targeted source controls for post-construction operations at a site.”
Section 6.0 Conclusion, Page 1-19
Design Criteria
“EURV represents the difference between the developed and pre-developed runoff volume for the range of storms that produce runoff from pervious land surfaces (generally greater than the 2-year event).”
Common Stormwater Management Terms, Page 1-9
“Water Quality Capture Volume (WQCV): This volume represents runoff from frequent storm events such as the 80th percentile storm. Within the UDFCD boundary, the WQCV is based on runoff from 0.6 inches of precipitation.”
Common Stormwater Management Terms, Page 1-9; Section 4.2, Page 1-17
No evidence cited
No evidence cited
“permeable pavement systems with subsurface storage, bioretention, extended detention basins, sand filters, constructed wetland ponds, and retention ponds. Green roofs and some underground BMPs may also provide the WQCV”
Section 4.2, Page 1-17