Stormwater Atlas

City of Aurora

Storm Drainage Design and Technical Criteria

CityColoradomediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Aurora SDDTC Jan 2026; return periods inferred from typical MHFD/Aurora practice — confirm exact list from hydrology chapter.

Fields not found in document: design_criteria.required_hydrologic_hydraulic_software

Document Metadata

Jurisdiction level
City

“City of Aurora”

Purpose

State
Colorado

“Aurora City Code Section 138-363”

Purpose

Version / edition
January 2026

“January 2026”

Cover / footer

Adoption / effective date
2026-01

“January 2026”

Cover

Last revised date
2026-01

“January 2026”

Cover

Relationship to state manual
independent

“Mile High Flood District's (MHFD) Urban Storm Drainage Criteria Manual”

Purpose

Design Criteria

Design storm return periods (years)
2-year, 5-year, 10-year, 25-year, 100-year

“detention / storm frequencies”

Design criteria chapters

Water quality volume method
Detention and water quality policies (Section 3.13). Incorporates Mile High Flood District (MHFD) Urban Storm Drainage Criteria Manual for criteria not in this Manual. Water quality SCMs and MEP facility certification requirements.

“When Detention and/or Water Quality is Required”

Section 3.13.1

Peak flow calculation method(s)
Rational Method runoff coefficients (Section 5.3.2), Detention sizing and variance criteria (Section 3.13), Hierarchy: Aurora Manual first, then MHFD Volumes 1–3

“Runoff Coefficients for Rational Method”

Section 5.3.2

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Detention ponds, Water quality stormwater control measures (SCMs), MHFD-referenced treatment BMPs

“Water Quality SCMs”

Section 2.7 / 3.13