Stormwater Atlas

City of Dayton

Department of Water Engineering Design Standards — Section 5 Storm Water Requirements

CityDEP / DEQOhiomediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Section 5 only (11 pages); not a full multi-volume BMP design manual. HEAD 404 but GET works. Pipeline excerpt repair removed 1 unlocated citation(s).

Fields not found in document: design_criteria.required_hydrologic_hydraulic_software, document_metadata.relationship_to_state_manual

Document Metadata

Jurisdiction level
City

No evidence cited

State
Ohio

No evidence cited

Version / edition
October 2020

October 2020

Header

Adoption / effective date
2020-10-01

No evidence cited

Last revised date
2020-10-01

No evidence cited

Relationship to state manual
Not found in document

No evidence cited

Design Criteria

Design storm return periods (years)
1-year, 25-year, 50-year, 100-year

Major waterways ... 100 years ... Secondary ... 50 years ... Minor ... 25 years

§5.1 A

Water quality volume method
Peak-rate control: post-development peak runoff ≤ pre-development for all 24-hour storms from 1-year through the critical year storm; detention volume methods based on percent increase in 1-year 24-hour runoff volume. Post-construction BMPs per Ohio EPA Construction General Permit OHC000002 (SWP3 Part III) with O&M manuals required. Section is conveyance/detention focused rather than a standalone WQv rainfall-depth manual.

post-development peak rate of runoff does not exceed that of the pre-development stage, for all 24-hour storms ... Post Construction Storm Water Management requirements ... Ohio EPA Permit No.: OHC000002

§5.1 D / §5.6

Peak flow calculation method(s)
Major waterways (>4 sq mi): 100-year, Secondary (1–4 sq mi): 50-year, Minor (≤1 sq mi open channels): 25-year, Detention: post ≤ pre for 24-hr storms 1-year through critical year, Runoff curve numbers / detention routing

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Detention basins, Retention basins, Storm sewer / closed conduits, Open channels, Post-construction BMPs per Ohio EPA CGP, Dry wells (limited / geotech)

Section 5.4 Detention/Retention Basins ... post construction BMPs

§5.4 / §5.6