June 2025 Columbus SWDM. Explicit WQv rainfall depth equation is deferred to OEPA CGP / Rainwater and Land Development Manual rather than restated as a single Columbus-only formula in Section 3.3. No named proprietary modeling package is mandated (methods are specified). Manual text: effective August 26, 2025. Pipeline excerpt repair removed 1 unlocated citation(s).

Fields not found in document: design_criteria.required_hydrologic_hydraulic_software, document_metadata.version_or_edition

Document Metadata

Jurisdiction level
City

Columbus Stormwater Drainage Manual June 2025 / Division of Sewerage and Drainage

Cover / headers

State
Ohio

Ohio EPA Construction General Permit / Rainwater and Land Development Manual

Section 3.3 / Definitions

Version / edition
Not found in document

No evidence cited

Adoption / effective date
2025-08-26

Effective August 26, 2025, the 2024 Stormwater Drainage Manual and the 1994 Erosion

Preface / Effective date

Last revised date
2025-06

Stormwater Drainage Manual List of Updates June 2025

List of Updates

Relationship to state manual
independent

The design criteria provided in this section are in addition to the criteria detailed in the Ohio Construction General Permit and the Ohio Rainwater and Land Development Manual.

Section 3.3

Design Criteria

Design storm return periods (years)
1-year, 2-year, 5-year, 10-year, 25-year, 50-year, 100-year

Type II 24-Hour Distribution Rainfall (in) Frequency: 100-yr 50-yr 25-yr 10-yr 5-yr 2-yr 1-yr

Table 2-3

Water quality volume method
Post-construction stormwater quality controls sized to the Water Quality Volume (WQv) and Water Quality Flow (WQf) per Section 3.3 / 6.2.9, using Ohio EPA Construction General Permit post-construction criteria and Ohio Rainwater and Land Development Manual methods (more stringent of OEPA vs Columbus criteria applies). Combined-sewer discharges are exempt from Section 3.3 water quality controls unless separation/redirection is planned. Extended detention example: release 50% of WQv in 8 hours and 100% of WQv per design tables.

All runoff from development sites shall be directed to one or more stormwater quality controls designed according to: 1. Appropriate currently effective Ohio EPA Authorization for Stormwater Discharges Associated with Construction Activity… 3. Appropriate currently effective Ohio Rainwater and Land Development Manual, and 4. Criteria provided in Section 3.

Section 3.3.1.1

Peak flow calculation method(s)
Rational Method (peak flows; up to 200 acres), USGS Regression Equations (streams; ~17–2600 acres), NRCS (SCS) Curve Number Method (peak flows up to 640 acres), Approved hydrograph methods (required for detention design and downstream analysis), Critical storm method for quantity control (Table 3-1): release ≤ critical storm at ≤ 1-year predevelopment peak; 100-year post ≤ 10-year predevelopment peak, SCS Type II 24-hour design storm hyetograph (Table 2-3) with NOAA Atlas 14 Central Ohio IDF

The City allows three methods for calculating stormwater runoff peak flows: 1. The Rational Method… 2. USGS Regression Equations… 3. The Natural Resources Conservation Service (NRCS… Curve Number method…

Section 2.2.1

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Dry detention pond, Wet detention pond, Constructed wetland / shallow constructed wetland, Parking lot storage, Infiltration basin, Vegetated filter strips, Underground detention system, Permeable pavement, Bioretention facilities (GI), Sand/media filter

Infrastructure Surface Controls Dry Detention Pond ● ● • OEPA CGP/Supplements • Columbus SWDM Wet Detention Pond ● ● • OEPA CGP/Supplements • Columbus SWDM Constructed Wetland ● ● • OEPA CGP/Supplements • Columbus SWDM Shallow Constructed Wetland ● ● • OEPA CGP/Supplements •