Stormwater Atlas

City of Charleston

Stormwater Management Guidance Manual

CityWest VirginiahighNoCitations verified
Fields not found in document: design_criteria.design_storm_return_periods_years
Other manuals in West Virginia: West Virginia, West Virginia

Document Metadata

Jurisdiction level
City

No evidence cited

State
West Virginia

No evidence cited

Version / edition
Version 1.0

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

No evidence cited

Design Criteria

Design storm return periods (years)
Not found in document

No evidence cited

Water quality volume method
Capture and infiltrate the first one (1) inch of rainfall on site (average 24-hour storm preceded by 48 hours of no measurable precipitation). Extended filtration practices designed to manage one inch of rainfall may discharge through an underdrain. Used as the City standard for water quality / post-construction runoff control (Ch.6).

infiltrating the first one (1) inch of rainfall on the site

Post-construction / permitting

Peak flow calculation method(s)
Engineering calculations (Ch.4), Detention basins (Ch.6.13), LID / runoff reduction practices

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Infiltration practices, Bioretention / planters, Permeable pavement, Impervious surface disconnection, Detention basins, Other Ch.6 post-construction measures

No evidence cited