City of South Salt Lake
South Salt Lake Stormwater Design Manual
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Compact manual with explicit 80th percentile 0.6-inch volume method, 100-year 24-hour design storm, Rational/TR-55 methods, and post-construction BMP appendix. Pipeline excerpt repair removed 3 unlocated citation(s).
Document Metadata
“The City of South Salt Lake implemented ordinances for storm water management”
Section 1.3, Page 1
“The State of Utah MS4 Permit”
Section 1.2, Page 1
No evidence cited
No evidence cited
No evidence cited
“The federal, state, and local regulations shall be followed for all stormwater discharge and design.”
Chapter 1, Page 1
Design Criteria
“The City of South Salt Lake requires 100 years 24 hours storm event for the new development/re-development hydrology calculations... Table 5-1 South Salt Lake City 24-hr Storm Event Intensity Rate... 10-year* 25-year* 50-year* 100-year”
Section 5.2 and Table 5-1, Pages 5-9 to 5-10
“For new developments, the new MS4 permit requires 80th percentile storm precipitation for the total disturbed area... 80th Percentile: 0.6 inches... V80 = RV × d80 × A”
Sections 3.1 and 3.2, Pages 3-4 to 3-5
“The City of South Salt Lake allows Rational Method and SCS Curve Number Method (NRCS TR-55 Hydrology Design Method) for the design of hydrology system.”
Section 5.1, Page 5-9
No evidence cited
“Sheet BR – Bioretention Cell... Sheet BS – Bioswale... Sheet RG – Rain Garden... Sheet TB – Tree Box Filters... Sheet VS – Vegetated Strips”
Appendix A, Page 15