South Dakota Department of Transportation (SDDOT)
Erosion and Sediment Control and Stormwater Management Course Manual
This extraction needs human review.
Construction ESC training course manual (Oct 2024), not a post-construction hydrologic design manual. Only explicit design storm is the 2-year/24-hour precipitation event for temporary ESC controls (manual + appended SDDANR CGP). No water quality volume sizing, peak-flow hydrology methods, or required modeling software found in the text.
Document Metadata
“SDDOT's Construction activities fall under the provisions of the SDDANR General Permit for Stormwater Discharges Associated with Construction Activities... manage the NPDES in South Dakota.”
Page 4
“South Dakota Department of Transportation (SDDOT)”
Page 1
“EROSION & SEDIMENT CONTROL Revised October 2024”
Cover / Table of Contents
No evidence cited
“Revised October 2024”
Cover
“The information in this training manual is intended for training purposes only and does not take precedence over the SDDOT Standard Specifications for Roads and Bridges, the SDDOT Materials Manual, or any SDDOT Policies and Procedures.”
Page 1
Design Criteria
“All sediment and erosion controls shall be selected, designed, and installed to function properly and withstand a 2 year/24-hour rain event.”
Page 4
No evidence cited
No evidence cited
No evidence cited
“Erosion Control BMP's... Slope Flow Control/Stormwater Runoff Management... Slope Velocity Controls... Channel Surface Control... Channel Velocity Control... Outlet Protection... Sediment Control BMP's... Inlet Protection... Perimeter Control... Stabilized Entrance Protection”
Table of Contents, Chapter 3