Stormwater Atlas

Rhode Island

RIDOT Linear Stormwater Manual

StateDOTRhode IslandmediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Heuristic agency extract from prepared text. RIDOT Linear Stormwater Manual (February 2019)

Fields not found in document: design_criteria.peak_flow_calculation_method, design_criteria.required_hydrologic_hydraulic_software
Other manuals in Rhode Island: City of Providence, Rhode Island

Document Metadata

Jurisdiction level
State

No evidence cited

State
Rhode Island

No evidence cited

Version / edition
Not found in document

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

No evidence cited

Design Criteria

Design storm return periods (years)
10-year, 100-year

foot per second. o Maximum velocity for 10-year design storm: 3 feet per second o If velocities are greater than the maximum ve

Water quality volume method
Water Quality Volume (WQV): The volume of the first inch of runoff from impervious surfaces (WQV = 1-inch X impervious area)

Water Quality Volume (WQV): The volume of the first inch of runoff from impervious surfaces (WQV = 1-inch X impervious area)

Peak flow calculation method(s)
Not found in document

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Bioretention, Infiltration Basin, Infiltration Trench, Extended Detention, Sand Filter, Vegetated Swale, Filter Strip, Oil/Grit Separator, Retention Basin

Bioretention, Infiltration Basin, Infiltration Trench, Extended Detention