Document Metadata
“City of Portland”
Cover
“Portland, Oregon”
Cover
“December 2020”
Cover
“December 2020”
Cover
“December 2020”
Cover
“The SWMM is a BES Administrative Rule and is authorized by Portland City Code Chapter 17.38.”
Page 1-5, Section 1.1
Design Criteria
“2 2.4 ... 5 2.9 ... 10 3.4 ... 25 3.8 ... 100 4.7”
Appendix A, Table A-9
“70% removal of total suspended solids (TSS) is required from the runoff from 90% of the average annual rainfall (1.61 inches over 24 hours, or 0.19 in/hr for a time of concentration of 5-minutes).”
Page 1-19, Section 1.3.4
“use either the Santa Barbara Urban Hydrograph (SBUH) Method, NRCS's TR-55, the Army Corps of Engineers' Hydrologic Modeling System (HEC-HMS) or HEC-1, or the Environmental Protection Agency's Storm Water Management Model (EPA-SWMM)”
Page 2-41, Section 2.5.3
“The Presumptive Approach can be used by design professionals to size green streets, planters, and basins using the Presumptive Approach Calculator (PAC), an online calculator maintained by BES.”
Page 2-36, Section 2.5.2
“Ecoroof ... Permeable Pavement ... Filter Strip ... Green Street ... Rain Garden ... Basin ... Planter ... Drywell ... Soakage Trench ... MSTT ... Structured Detention”
Page 2-34, Table 2-9