Mississippi
Erosion Control, Sediment Control and Stormwater Management on Construction Sites and Urban Areas — Volume 2 Stormwater Runoff Management Manual
Document Metadata
“Volume 2 Stormwater Runoff Management Manual”
Title Page
“Jackson, Mississippi”
Acknowledgments / Steering Committee
“Published 2011”
Title Page
“Published 2011”
Title Page
“Published 2011”
Title Page
“Volume 2 – Stormwater Runoff Management Manual was created by adapting North Carolina's Stormwater Best Management Practices Manual (2007) with Mississippi-specific information where appropriate.”
Acknowledgments
Design Criteria
“the post-construction peak stormwater discharge rate must be reduced to no greater than the pre-construction peak stormwater discharge rate (usually for the 2-year, 24-hour storm).”
Chapter 1, Comparison of BMP Treatment Capabilities
“There will be a volume of stormwater that must be captured and treated prior to release (typically first 1 inch or first 1.5 inches of rainfall).”
Chapter 1, Comparison of BMP Treatment Capabilities
“Runoff volumes and rates may be calculated using the SCS Runoff Curve Number Method (see Appendix Volume, Appendix A, A-16).”
Additional Criteria, Detention Practice Criteria
No evidence cited
“Infiltration... Grassed Swales... Infiltration Basin... Infiltration Trench... Filtration... Bioretention (Rain Gardens)... Sand and Organic Filters... Retention/Detention... Constructed Stormwater Wetland... Dry Detention Ponds... Wet Pond”
Table of Contents, Chapter 4