Stormwater Atlas

City of Dover

Delaware Sediment and Stormwater / Wet Pond Standards (capital MS4 partial)

CityDelawarelowNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Partial coverage via wet-pond chapter only — prefer full Delaware Technical Document when a stable public PDF is available.

Other manuals in Delaware: City of Wilmington, Delaware, Delaware

Document Metadata

Jurisdiction level
City

No evidence cited

State
Delaware

No evidence cited

Version / edition
Section 13.0 Wet Ponds (DRAFT public-notice revision)

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
adopts state manual directly

No evidence cited

Design Criteria

Design storm return periods (years)
100-year

No evidence cited

Water quality volume method
DNREC Sediment and Stormwater Program framework. Wet ED Ponds receive RPv credit via 48-hour extended detention of the Resource Protection Volume (RPv); exact RPv depth defined in Delaware Sediment and Stormwater Regulations. Capital MS4 follows statewide standards; full technical document PDF often unavailable via direct download.

48-hour extended detention of the Resource Protection Volume (RPv)

Wet Ponds §13

Peak flow calculation method(s)
Site-adjusted runoff curve number (RCN), Cv / Fv quantity management per DNREC regulations

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Wet Quantity Management Pond, Wet Extended Detention (ED) Pond, Other DNREC-approved BMPs

No evidence cited