City of Dover
Delaware Sediment and Stormwater / Wet Pond Standards (capital MS4 partial)
CityDelawarelowNeeds reviewCitations verified
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Partial coverage via wet-pond chapter only — prefer full Delaware Technical Document when a stable public PDF is available.
Document Metadata
Jurisdiction level
City
No evidence cited
State
Delaware
No evidence cited
Version / edition
Section 13.0 Wet Ponds (DRAFT public-notice revision)
No evidence cited
Adoption / effective date
Not found in document
No evidence cited
Last revised date
Not found in document
No evidence cited
Relationship to state manual
adopts state manual directly
No evidence cited
Design Criteria
Design storm return periods (years)
100-year
No evidence cited
Water quality volume method
DNREC Sediment and Stormwater Program framework. Wet ED Ponds receive RPv credit via 48-hour extended detention of the Resource Protection Volume (RPv); exact RPv depth defined in Delaware Sediment and Stormwater Regulations. Capital MS4 follows statewide standards; full technical document PDF often unavailable via direct download.
“48-hour extended detention of the Resource Protection Volume (RPv)”
Wet Ponds §13
Peak flow calculation method(s)
Site-adjusted runoff curve number (RCN), Cv / Fv quantity management per DNREC regulations
No evidence cited
Hydrologic/hydraulic software
Not found in document
No evidence cited
Approved BMP categories
Wet Quantity Management Pond, Wet Extended Detention (ED) Pond, Other DNREC-approved BMPs
No evidence cited