Stormwater Atlas

Municipality of Anchorage

Anchorage Stormwater Manual Volume 1 – Management and Design Criteria (Design Criteria Manual Chapter 2 – Drainage)

CityAlaskahighNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Source PDF is labeled DRAFT March 2015 (ASM Volume 1 / DCM Ch. 2). Confirm whether a later adopted edition supersedes this draft before relying on criteria operationally. Software listed are common models in Table 4.8-1, not an exclusive required list.

Fields not found in document: document_metadata.adoption_or_effective_date
Other manuals in Alaska: Alaska, Alaska, City and Borough of Juneau

Document Metadata

Jurisdiction level
City

MUNICIPALITY OF ANCHORAGE

Title Page

State
Alaska

State of Alaska 18 AAC 70 Water Quality Standards

Section 1.4.2

Version / edition
Version 1.0, DRAFT March 2015

Version 1.0 DRAFT March 2015

Title Page

Adoption / effective date
Not found in document

No evidence cited

Last revised date
2015-03

DRAFT March 2015

Title Page

Relationship to state manual
independent

Local and State Codes Related to Stormwater... Municipal Stormwater Policies

Sections 1.4–1.5

Design Criteria

Design storm return periods (years)
1-year, 2-year, 5-year, 10-year, 25-year, 50-year, 100-year

Table 4.2-1: MOA Design Storm Depths... 10-year, 24-hour... 100-year, 24-hour... Extended Detention 1-year, 24-hour... Peak Flow Control 2-year, 24-hour... 10-year, 24-hour... 100-year, 24-hour

Table 4.2-1, Page 4-4

Water quality volume method
Treat runoff from the first 0.52 inches of rainfall from a 24-hour event preceded by 48 hours of no precipitation (90th-percentile water quality storm) using Green Infrastructure (retention, infiltration, bioretention, evaporation, rainfall harvesting, and/or combinations). Volume estimated by Direct Determination Method or SWMM. Extended detention (when GI not used for WQ): detain post-development excess over pre-development for the 1-year, 24-hour storm for 6 hours. Oil/grit separator annual goals include 80% reduction of inorganic sediment ≥100 μm when traditional treatment is used.

Treatment must be provided for runoff generated from the first 0.52 inches of rainfall from a 24-hour rainfall event preceded by 48 hours of no precipitation.

Section 3.2.2.1, Page 3-4

Peak flow calculation method(s)
Rational Method, NRCS (SCS) Peak Flow Method (Tabular Method) / TR-55, NRCS (SCS) Tabular Hydrograph Method, Direct Determination Method (water quality volume), USGS Regression Equations, Unit Hydrographs, Kinematic-Wave Method, Non-Linear Reservoir Method, SCS Type I, 24-hour rainfall distribution

4.5.2 Rational Method... 4.5.3 NRCS (SCS) Peak Flow Method (Tabular Method)... 4.5.4 USGS Regression Equations... 4.5.5 NRCS (SCS) Tabular Hydrograph Method

Table of Contents / Chapter 4

Hydrologic/hydraulic software
SWMM (EPA), HEC-HMS, HEC-RAS, PondPack, HY-8

Criteria March 2015 vii LIST OF TABLES Table 2.1-1: Summary of Urban Stormwater Pollutants ............................................................ 2-7 Table 3.2-1: Summary of Stormwater Standards and Requirements.......................................... 3-3 Table 4.

p. 9

Approved BMP categories
Bioretention, Soakaway Pits, Infiltration Basins, Infiltration Trenches, Vegetative Swales, Pervious Pavement, Chamber Systems, Wet Ponds, Dry Ponds (enhanced), Sedimentation Basins, Filter Strips, Constructed Wetlands, Canopy Cover/Vegetation Retention, Landscaped Depressions, Oil and Grit Separators (traditional treatment when GI infeasible)

Bioretention • Soakaway Pits • Infiltration Basins • Infiltration Trenches • Vegetative Swales • Pervious Pavement • Chamber Systems • Wet Ponds • Dry Ponds (if they are enhanced) • Sedimentation Basins • Filter Strips • Constructed Wetlands • Canopy Cover/Vegetation Retention • Landscaped Depressions

Section 3.2.2.1, Page 3-4