Stormwater Atlas

Bernalillo County

Bernalillo County Green Stormwater Infrastructure Low Impact Design Strategies for Desert Communities

CountyNew MexicomediumNeeds review

This extraction needs human review.

Abbreviated GSI/LID digest for arid-climate implementation; references Bernalillo County Ordinance 2107-8 and DPM for quantitative design but does not include peak-flow methods, hydrologic software, or detailed storm sizing equations. Edition inferred from source PDF URL (March 2025).

Fields not found in document: document_metadata.adoption_or_effective_date, document_metadata.last_revised_date, design_criteria.design_storm_return_periods_years, design_criteria.peak_flow_calculation_method, design_criteria.required_hydrologic_hydraulic_software

Document Metadata

Jurisdiction level
county

Bernalillo County approved and implemented Ordinance 2107-8 to address requirements specified in the Watershed Based MS4 permit

Recap of BernCo Stormwater Quality Ordinance, Page 9

State
New Mexico

Bernalillo County location within New Mexico state

Context, Page 9

Version / edition
March 2025

61-Green_Infrastructure_and_Low_Impact_Design_Guide_1-1.pdf

Source URL (March 2025)

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

This document and others like it, while containing useful information regarding the implementation and the benefits of GI/LID interventions, are highly technical and cumbersome making them inaccessible to the general public.

Introduction and Purpose, Page 6

Design Criteria

Design storm return periods (years)
Not found in document

No evidence cited

Water quality volume method
Bernalillo County Ordinance 2107-8 requires storm water treatment volumes of 90% storm capture for new development and 80% storm capture for redevelopment within site boundaries; this digest references the Design Process Manual (DPM) for detailed sizing and construction details.

storm water treatment volumes (90% storm for new development, 80% storm for redevelopment) must be addressed within the boundaries of a proposed site development/redevelopment plan

Recap of BernCo Stormwater Quality Ordinance, Page 9

Peak flow calculation method(s)
Not found in document

No evidence cited

Required hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Bioswale, Infiltration Trench, Stormwater Curb Extension, Raised Median, Stormwater Tree Pit with Grate, Stormwater Planter Box, Pervious Pavement, Permeable Check Dam, Stacked Stone Erosion Control Basin (Zuni Bowl), Stone Channel Plating, Contour Swale, Media Luna Flow Spreader

Bioswale, Infiltration Trench, Stormwater Curb Extension, Raised Median, Stormwater Tree Pit with Grate, Stormwater Planter Box, Pervious Pavement, Permeable Check Dam, Stacked Stone Erosion Control Basin "Zuni Bowl", Stone Channel Plating, Contour Swale, Media Luna Flow Spreader

Table of Contents, Pages 4-5