Alabama
Erosion Control, Sediment Control and Stormwater Management on Construction Sites and Urban Areas (The Blue Book)
Document Metadata
“in the State of Alabama”
Page ix, Introduction
“Montgomery, Alabama”
Title Page
“Volume 1... 2022... This major revision No. 5 of July 2022”
Title Page; Page ix
“July 2022”
Title Page
“A concerted effort has been made to make the July 2022 Blue Book an accurate and comprehensive handbook”
Page i, Foreword
“The Alabama Handbook for Erosion Control, Sediment Control and Stormwater Management on Construction Sites and Urban Areas (The Blue Book)”
Page ix
Design Criteria
“Temporary Construction Areas 2-year... Building Sites 5-year... Agricultural Land 10-year... Isolated Buildings 25-year... Urban areas, Residential, School, Industrial Areas, etc. 50-year”
Page 181, Table DV-1
“the first flush equates to the first 1" of runoff which carries 90% of the pollution load from a storm (USGS, 1984)”
Page 9, Chapter 2
“The peak rate of runoff should be determined using the Natural Resources Conservation Service runoff curve number (RCN) method or other equivalent methods.”
Page 181, Diversion
“Software for the design of a diversion can be found in the USDA-NRCS Engineering Field Tools (EFT).”
Page 183, Diversion
“Site Preparation... Surface Stabilization... Runoff Conveyance... Sediment Control... Stormwater Management... Stream Protection”
Table of Contents, Pages vii–viii